@jukan05 30-45 weeks to get a GPU. If you can't wait that long, and most startups can't, give us a shout.
Reply to @juk | Hanami
@jukan05 30-45 weeks to get a GPU. If you can't wait that long, and most startups can't, give us a shout.
Reply to @jukan05: TrendForce:
GPU lead times are 30–45 weeks, with the upper end of the range up 5 weeks from the previous week.
DRAM lead times have shortened to 19 weeks, down 1 week from the previous week.
MLCC lead times have extended to 38 weeks, up 3 weeks from the previous week.